Explore Our Projects

As of March 2022 there have been 96 projects submitted. This list will continue to be updated as projects are added or updated.

Interconnection with Apple Valley Ranchos Water Company
Project Funding Area

Lahontan

Project Description

Install an interconnection with Apple Valley Ranchos Water Company to provide additional supply.

Lead Agencies

Apple Valley South, Golden State Water Company

Updates & Comments

Need statewide priorities, program preferences or RMS.

38R
In-Progress
Wastewater / Recycled Water
JBWD Central Wastewater Treatment Plant Project
    Project Objective
  • 10: Preserve water quality
  • 14: Increase use of recycled water
  • 5: Optimize region’s water-related assets
Project Funding Area

Colorado

Project Description

Design and construction of required central WWTP to include plant siting, WWTP design, trunk sewer alignment and design, environmental compliance, permitting and construction. Central WWTP provides long-term control of nitrate contamination in groundwater basin, as well as other contaminants identified in past studies.

Lead Agencies

Joshua Basin Water District

Contact People

Mark Ban

JBWD CUWCC Compliance Project - Leak Detection
Project Funding Area

Colorado

Project Description

System-wide leak detection program to identify and eliminate potential water system leaks, thereby reducing water loss and conserving the regions available water supplies.

Lead Agencies

Joshua Basin Water District

Updates & Comments

CRWA just finished a large Leak Detection effort in the area. Planning, Design and Implementation of District-wide Leak Detection Program per CUWCC policies.

3R
Conceptual
Water Supply / Recharge
Ames/Reche Groundwater Storage and Recovery Program - Phase II Expansion
    Project Objective
  • 01: Balance future water demands
  • 03: Maintain stability in overdrafted groundwater basins
  • 07: Support to DACs
Project Funding Area

Colorado

Project Description

Expand the Ames/Reche Recharge Facility to accommodate the maximum potential delivery capacity of 3,000 AF/Yr. (currently permitted for 1,500 AF/Yr.).

Lead Agencies

Bighorn-Desert View Water Agency, Hi-Desert Water District, Mojave Water Agency

Contact People

Marina West
Tony Winkel

40R
Flood Management
JBWD Graywater & Rainwater Harvesting Project
Project Funding Area

Colorado

Project Description

Development of design standards and funding of on-site collection facilities for capture of graywater and rainwater by individual property owners located in the JBWD service area. Water collected would be used for gardening and other non-potable uses, reducing dependence on groundwater. Public education is an important component of the project and will include printed materials and demonstration models of collection facilities. Project compliments the District’s new imported water recharge project and educates property owners about how graywater and rainwater collection can contribute to increasing local water supplies and conserving groundwater.

Lead Agencies

Joshua Basin Water District

Contact People

Mark Ban

Updates & Comments

Integrated with Storm Water Resources Plan (10/2017) Inactive Per JBWD 2/3/2020

41R
Flood Management
JBWD Stormwater Recovery Project
    Project Objective
  • 04: Reduce reliance on Delta
  • 09: Improve floodplain management
  • 5: Optimize region’s water-related assets
Project Funding Area

Colorado

Project Description

Capture and retain stormwater from local arroyos into the new recharge basin to enhance percolation potential into the groundwater basin. Includes studies to determine quantities of stormwater that could be recharged, engineering feasibility for retention and percolation and environmental review. Project would increase groundwater basin recharge and minimize downstream impacts.

Lead Agencies

Joshua Basin Water District

Contact People

Mark Ban

Updates & Comments

Integrated with Storm Water Resources Plan (10/2017) Inactive Per JBWD 2/3/2020

42R
Conceptual
Individual or Small System Improvements
Johnson Valley Pressurized Water System
    Project Objective
  • 01: Balance future water demands
  • 03: Maintain stability in overdrafted groundwater basins
  • 07: Support to DACs
Project Funding Area

Colorado

Project Description

Approximately 1/3rd of the Agency’s service area is without a pressurized water supply. Residents in these areas rely on hauled water (self-haul or commercial delivery). Property owners are now prohibited from building or improving their property using hauled water as the water supply. Project would bring a pressurized water distribution system to the area to improve quality of life, public health and provide for enhanced fire protection.

Lead Agencies

Bighorn-Desert View Water Agency

Contact People

Marina West

Lucerne Valley Small Water Systems Feasibility Study
Project Funding Area

Colorado

Project Description

Prepare a feasibility study to explore the consolidation of the ten mutual water companies, local school district, CDA 29 & Hitchin Lucerne Inc retail commercial property. This would be a two phase study addressing 1) managerial & resources consolidation & 2) physical infrastructure tie-in consolidation

Lead Agencies

Lucerne Valley Small Water Systems

Mesa Tank #4, Well #5, Well Generators, Booster Station Generator, etc.
Project Description

District want to investigate avenues for fire protection, adequate water storage, energy costs, power loss protection.

Lead Agencies

Apple Valley Heights County Water District

Updates & Comments

Planning grant awarded, ongoing assistance

49
Complete
Environmental & Recreation
Mojave River Walk Trail
    Project Objective
  • 07: Support to DACs
  • 08: Improve environmental stewardship
  • 12: Improve public awareness
Project Funding Area

Lahontan

Project Description

Walking / biking trail along the Mojave River. Combined recreational and public education project involving multiple participating agencies.

Lead Agencies

Victorville City

Contact People

Carlos Seanez